fullymatted.
Back to search
996 Carrera Group 1 – Part 2 Engine / PAGE 347

25. Postionthe right fastening screw -C-. Positionthe left genera- ~ / · tor fastening

Add to repair workspace
Open repair workspace
Open full manual Original source
Original manual page 347
Read extracted page text

OCR can contain errors. Check the original page image for exact wording, warnings and specifications.

911 Carrera (996) Engine -Cooling 25. Postionthe right fastening screw -C-. Positionthe left genera- ~ / tor fastening screw -A- in the direction of travel. Install deflec- tion roller -8- underthe generator andtighten. Tightenthe right and left tightening screw of the generator. Tightening torque for all three screws: 46 Nm (34 ftlb. 0 I~ 26. Mountthe belt pulleyof the hydraulicpumpwiththe fitted drive ... belt of the hydraulicpump. Screwin threehexagon-headbolts by hand. The hexagon-headscrews can be fastenedafter tensioningthe drive belt. 27. Fit drive belt. To do this, turn the tensioninglever of the ten- sioning roller clockwise and hold. At the sametime, place the drive belt onto the drive wheels of the air-conditioningcompres- sor, the idler pulleyand the generator. Now slowlyreleasethe tensioninglever. ~ 1\ /~;::;;7 ' 196219 Removing and installing coolant hoses -GT3 19-73 page 19IJ...~

This is a source reference. Confirm exact model applicability in the original material.