fullymatted.
Back to search
Group 9 · Electrics / PAGE 30

Filling via the high-pressure side · ~~~ rn ~~..

Add to repair workspace
Open repair workspace
Open full manual Original source
Original manual page 30
Read extracted page text

OCR can contain errors. Check the original page image for exact wording, warnings and specifications.

Filling via the high-pressure side ~~~ rn ~~.. 1836-87 A-close B -open 1 -ON/OFF 2 -HEATING Pressure 8 10 bar. * * If pressure is less than 8 bar. After using the SECU,perform internal suction removal (see Page 87 -5); first close the hand valves on both suction lines. 87 -10 8703 17 Assembly work on the air-conditioning system 996871 Printed in Germany, 1997

This is a source reference. Confirm exact model applicability in the original material.