Group 9 · Electrics / PAGE 30
Filling via the high-pressure side · ~~~ rn ~~..
Read extracted page text
OCR can contain errors. Check the original page image for exact wording, warnings and specifications.
Filling via the high-pressure side
~~~ rn ~~..
1836-87
A-close B -open
1 -ON/OFF
2 -HEATING
Pressure 8 10 bar.
* * If pressure is less than 8 bar.
After using the SECU,perform internal suction removal (see Page 87 -5);
first close the hand valves on both suction lines.
87 -10 8703 17 Assembly work on the air-conditioning system
996871 Printed in Germany, 1997
This is a source reference. Confirm exact model applicability in the original material.
