Single Row Pro IMS Retrofit Installation Manual — LN Engineering / PAGE 21
Start the larger of the two nuts on the threaded rod closest to the end as shown above. · Hold the smaller of the two nuts on the
Read extracted page text
OCR can contain errors. Check the original page image for exact wording, warnings and specifications.
STEP
21
Start the larger of the two nuts on the threaded rod closest to the end as shown above.
Hold the smaller of the two nuts on the inside of the bearing puller tube cap while threading in the threaded
rod until larger nut is flush with top of bearing puller tube cap.
Do not forget to include the thrust washer between the large nut and the top of the bearing puller tube.
INSTALLATIONINSTALLATIONMANUALMANUAL PAGE 18
This is a source reference. Confirm exact model applicability in the original material.
