fullymatted.
Back to search
Porsche DME 7.8 — OBD II Diagnosis Manual / PAGE 56

DME 7.8 DME 7.80 · ♦Catalytic converter monitoring time, bank 1 [cumulated time in

Add to repair workspace
Open repair workspace
Open full manual Original source
Original manual page 56
Read extracted page text

OCR can contain errors. Check the original page image for exact wording, warnings and specifications.

DME 7.8 DME 7.80 ♦Catalytic converter monitoring time, bank 1 [cumulated time in which the rpm/load range was reached for testing the catalytic converter] ♦Mean amplitude after catalytic converter, bank 2 ♦Catalytic converter monitoring time, bank 2 [cumulated time in which the rpm/load range was reached for testing the catalytic converter] ♦Period counter, bank 1 [monitoring of oxygen sensor aging - 16 periods are necessary for the OK measurement] ♦Period counter, bank 2 [monitoring of oxygen sensor aging - 16 periods are necessary for the OK measurement] ♦Distance since power failure ♦Distance with Check Engine on ♦Rough running reference [limit value for rough running, cylinders 1 to 6] ♦State: adaptation 1 [the adaptation is reset to 0 after the battery has been disconnected. In order to carry out adaptation, the vehicle must be driven in overrun between 3.500 rpm and 1.800 rpm. 4 rpm ranges are displayed per load range (the fourth rpm range is not used). The ranges are bit coded and are given as a decimal number. Figure 1 1 - rl - Load 2 - n - Speed 3 - e.g. -2/1 means the second rpm range (field 2) of load range 1 1 = Field 1 has been adapted 2 = Field 2 has been adapted 3 = Fields 1 and 2 have been adapted 4 = Field 3 has been adapted 5 = Fields 1 and 3 have been adapted 6 = Fields 2 and 3 have been adapted 7 = Fields 1, 2 and 3 have been adapted The fields have different priorities 0-2a page 6 Data Output with the Porsche System Tester 2 pst_dm78 Printed in Germany – 4, 2002

This is a source reference. Confirm exact model applicability in the original material.