fullymatted.
Back to search
Workshop Manuals

Component Tests and General Diagnostics|Page 5392

Add to repair workspace
Open repair workspace
Original source
Page 28 The PCM2 consists of at least two but a maximum of four MOST nodes, (Gateway, MMI and Navigation and VOCS (optional)), which communicate with each other electronically via the MOST. Data is transferred outside of the PCM2 via the optical MOST. Telephone/Telematics The telephone/telematics feature is available as an option and is linked to the PCM2 via the optical waveguide. Tuner The tuner is part of the PCM2 (on the main board). MOST Unlock Counter Interruptions occur in the system if perfect communication is no longer possible. If the relevant threshold values are exceeded, an entry is recorded in the appropriate control module and the 'unlock counter' is incremented. External Amplifier The external amplifier (Harman or BOSE) is available as an optional feature and is linked to the PCM2 via the optical waveguide. Internal Amplifier The internal amplifier is part of the PCM2 (installed on the main board). Wake-up Function All control units connected to the MOST are in sleep mode if the PCM2 is deactivated. When the PCM2 is switched on, a 'wake-up signal' is sent via the MMI. This signal is answered by the MOST control modules that are connected via the optical MOST. The check-back signals are stored as a MOST actual installed components list by the MMI and are compared with the MOST required installed components list. If a control unit is not detected, this will be reported to the gateway and stored. The MOST switch will then close and control units connected to the optical MOST will be switched off again. If the MOST actual installed components list matches the MOST required installed components list and the checkbacks occur within 40 ms , communication will be established with all control units. The MOST switch will now be held open. Terminating Resistors PCM2 MMI Control Module Function (part 1) Terminating Resistors In The CAN A terminating resistor is fitted to each end of the wiring to prevent reflection on the wiring. These terminating resistors are integrated into two control modules. CAN Comfort Communication between the Porsche System Tester II No. 9588 and the MOST control modules only takes place via the K lead to the instrument cluster. The data is transferred from the instrument cluster gateway to the MOST control modules, via CAN Comfort to the PCM2 gateway, via the electrical MOST in the PCM2 and via the optical MOST outside of the PCM2. CD Changer (CDC) The CDC is available as an optional feature and is linked to the PCM2 via the optical waveguide. Coding Table

This is a source reference. Confirm exact model applicability in the original material.