fullymatted.
Back to search
Workshop Manuals

Foreward|Page 6565

Add to repair workspace
Open repair workspace
Original source
Page 198 G 8.3.2 Painting GFK/SMC spoilers WARNING:  -> 2 "Safety regulations" and read the product-specific safety instructions on the container labels. G 8.3.2.1 Phase I - Preparation G 8.3.2.2 Phase II - Primer Step 1: Prime areas sanded through to bare material with 285-16 VOC

This is a source reference. Confirm exact model applicability in the original material.