Page 7
6
-
Fastening convertible-top covering at front
A cardboard strip and a self-adhesive strip are affixed at the front of the convertible-top covering.
1. Pull the protective film off the Teflon adhesive tape.
2. Fold the convertible-top material around the roof frame edge without wrinkles. The convertible-top covering is initially held with fixing
clips.
7
-
Fastening the retaining rail and convertible-top seal on the roof frame 1
1. Remove the fixing clips.
2. Insert convertible-top seal
-12-
at the front corners into roof frame 1 in
-direction of arrow-
and tighten with torx screws T25
-11-
.
Tightening torque:
1.7 Nm (1 ftlb.)
1. Position the retaining rail
-10-
on roof frame 1 and tighten using T25 Torx screws
-9-
.
Tightening torque:
3.5 Nm (2.5 ftlb.)
8
-
Fastening seals and retaining strip at the sides of the roof frame
The seal on the roof frame at the sides consists of two parts.
1. Position the upper seal
-6-
onto the retaining strip
-7-
in
-direction of arrow A-
and screw on to roof frame with the Torx screws T15
-8-
.
Tightening torque:
2.8 Nm (2 ftlb.)
1. Press the lower seal
-5-
into the profile of the retaining strip
-7-
.
This is a source reference. Confirm exact model applicability in the original material.
