996 Carrera Group 1 – Part 1 Engine / PAGE 196
16. Tightening specification: 18. Prepare preassembledconnecting rod · of cylinder 2 for installation.
Read extracted page text
OCR can contain errors. Check the original page image for exact wording, warnings and specifications.
911 Carrera (996) Engine -Crankshaft, pistons
16. Tightening specification: 18. Prepare preassembledconnecting rod
of cylinder 2 for installation.
Oil thread and contact surface. Perform the following assemblysteps
as described from Step 8 to Step 16.
1. Initial tightening 20 Nm (15 ftlb.
19. Fitting piston and connecting rod in
To facilitate subsequentchecks it is cylinder 3
recommended that, after initial tightening,
the screw heads be marked with a coloured Rotate crankshaftclockwise until bore U6 on
pen. the belt pulley is aligned with the fixing bore
on the crankcase. Position or fix with fixing
2. Final tightening 1 x 900 turn pin (short) of special tool 9595.
Use 10 mm socket wrench insert (double
hexagon). "'\\
~
17. Fitting piston and connecting rod in
cylinder 2 ~
Turn crankcase by 180°. Turn crankshaft
clockwise until the bore U5 on the pulley
is aligned with the fixing bore on the
crankcase. Position or fix with fixing "0 U6 pin (short) of special tool 9595.
603_97
~
"\ ~ 20. Prepare preassembled connecting rod
lQ of cylinder 3 for installation. Perform
~ the following assembly steps as described
from Step 8 to Step 16.
Note
us theLeavepistoncrankshaftand connectingat positionrodU6in aftercylinderfitting3.
~ fittingThis positionof the pistonis necessaryof cylinderfor subsequent6.
605_97
21. Removebeltpulley.
Removing and installing pistons 13 -53
This is a source reference. Confirm exact model applicability in the original material.
