fullymatted.
Back to search
996 Carrera Group 1 – Part 2 Engine / PAGE 257

Installing bracket for oil cooler -GT3 · 10 Fasteningpositive crankcase ventilationand oil

Add to repair workspace
Open repair workspace
Open full manual Original source
Original manual page 257
Read extracted page text

OCR can contain errors. Check the original page image for exact wording, warnings and specifications.

911 Carrera (996) Engine -Lubrication Installing bracket for oil cooler -GT3 10 Fasteningpositive crankcase ventilationand oil container. Push on the positive crankcase ventilationhose again and tighten the hose clamp. Screw in the oil containerfastening screws again and tighten to 23 Nm (17 ftlb.J. 11 Pushingon oil level sender and tightening the oil line. Push on the connecting cable of the oil level sender. Then tighten the oil return line of the cylinder head. Make sure to counter with a wrench at the oil container when doing this. 12 Tighteningoil return line and vent line. Tighten oil return line on the oil container. Make sure to counter with a wrench at the oil container when doing this. Push on the ventilationhose again and tighten the hose clamp. 17 -95

This is a source reference. Confirm exact model applicability in the original material.