fullymatted.
Back to search
996 Carrera Group 1 – Part 2 Engine / PAGE 298

No. Procedure Instructions · 4 Install closure cap

Add to repair workspace
Open repair workspace
Open full manual Original source
Original manual page 298
Read extracted page text

OCR can contain errors. Check the original page image for exact wording, warnings and specifications.

911 Carrera (996) Engine -Cooling No. Procedure Instructions 4 Install closure cap Reinstall the closure cap beside the oil extraction pump on the cylinder bank 1 to 3. Lightly grease the O-ring to do this. Press in the closure cap evenly by hand. Tighten the three fastening screws to 10 Nm (7.5 ftlb.), 5 Bleedcoolantcircuit Bleed the coolant circuit carefully. To do this, lift the bow on the closure cap. (Serv. No.: 193817). Replacemissing coolant.

This is a source reference. Confirm exact model applicability in the original material.