996 Carrera Group 4 Running Gear / PAGE 45
No. Designation Qty. Removal Installation · Wheelhub 1 Press out with pre
Read extracted page text
OCR can contain errors. Check the original page image for exact wording, warnings and specifications.
Note:
No. Designation Qty. Removal Installation
Wheelhub 1 Press out with pressure Press in under a hydraulic
piece P 297 A under a press.
hydraulic press. For this To do this, place the
purpose, use the separator wheel hub on the wheel
and correspondingshims centring device and press
for support it on the wheel bearing
inner race using
pressure piece VW415 A
2 Hexagon-headbolt (10.9) 4 Tighten to 37 Nm
(27 ftlb.)
3 Lid 1 Fit in correct position
(groove down)
4 Wheelbearing 1 Heatwheel bearing housing Heat wheel bearing
to approx. 1000 C housingto approx.
(max. 1200 C). 1000 C (max. 1200 C)
Press out wheel bearing Insert new wheel bearing
with tubular piece in correct position
VW415 A (tool C) (inscriptionfacing the
wheel hub), and then
press again slightly
using pressure piece
9247/4 (tool 0) and
tubular piece
VW415 A (tool C)
40 57 19 Removing and installing front wheel bearing 40 -15
Printed in Germany -21, 1999 9964013
This is a source reference. Confirm exact model applicability in the original material.
