fullymatted.
Back to search
996 Carrera Group 6 Body Equipment, Exterior / PAGE 232

No. Procedure Instructions · Danger of short circuit and burns at the convertible top!& > Wir

Add to repair workspace
Open repair workspace
Open full manual Original source
Original manual page 232
Read extracted page text

OCR can contain errors. Check the original page image for exact wording, warnings and specifications.

911 Carrera (996) Glazing, window control No. Procedure Instructions Warning: Danger of short circuit and burns at the convertible top!& > Wire strands must not be crossed. 8 Connecting power cord Connectpower cord to the wire strands as close as possible to the convertibletop covering. The red LED will light up for approx. 5 seconds when the operating voltage is connected;this permits a polarity test. Press button of the switching clock to initiate the hot-meltprocess. The timer (2 minutes) set in the switching clock ends automatically. The green LED is lit during the welding process. If smoke occurs, disconnectthe power cord and check the contact pressure. Disconnectthe power cords after the hot-meltprocess. Allow the bond to cool down for 20 minutes;the tools must remain on the convertible top during the cooling time. After the cooling time has elapsed,detach the belt strap and remove the tools. Check rear window bond for visibility and tightness; repeat steps No.5 to No.8 if necessary. The belt strap tension must not be changed by entering or leaving the vehicle during the hot-melt process and the cooling time! 64 85 19 Removing and installing flexible rear window of Cabriolet 64 -37 Printed in Germany -13, 1998 9966431

This is a source reference. Confirm exact model applicability in the original material.