996 Carrera Group 6 Body Equipment, Exterior / PAGE 232
No. Procedure Instructions · Danger of short circuit and burns at the convertible top!& > Wir
Read extracted page text
OCR can contain errors. Check the original page image for exact wording, warnings and specifications.
911 Carrera (996) Glazing, window control
No. Procedure Instructions
Warning:
Danger of short circuit and burns at the convertible top!& > Wire strands must not be crossed.
8 Connecting power cord Connectpower cord to the wire strands as close as possible
to the convertibletop covering. The red LED will light up
for approx. 5 seconds when the operating voltage is
connected;this permits a polarity test. Press button of the
switching clock to initiate the hot-meltprocess. The timer
(2 minutes) set in the switching clock ends automatically.
The green LED is lit during the welding process.
If smoke occurs, disconnectthe power cord and check
the contact pressure. Disconnectthe power cords after
the hot-meltprocess. Allow the bond to cool down for
20 minutes;the tools must remain on the convertible
top during the cooling time.
After the cooling time has elapsed,detach the belt strap
and remove the tools.
Check rear window bond for visibility and tightness;
repeat steps No.5 to No.8 if necessary.
The belt strap tension must not be changed by entering or leaving the vehicle during
the hot-melt process and the cooling time!
64 85 19 Removing and installing flexible rear window of Cabriolet 64 -37
Printed in Germany -13, 1998 9966431
This is a source reference. Confirm exact model applicability in the original material.
