Porsche DME 7.8 — OBD II Diagnosis Manual / PAGE 538
DME 7.8 DME 7.80 · Work instruction Display OK
Read extracted page text
OCR can contain errors. Check the original page image for exact wording, warnings and specifications.
DME 7.8 DME 7.80
Work instruction Display OK If not OK
3 Check voltage supply and ♦Remove connector of EVAP can- Battery positive volt-
wiring. ister purge valve age
♦Switch on the ignition
♦Measure voltage between pin 1
and ground
♦Connect special tool 9637 to 0 - 5 Ω
wiring harness
♦Measure resistance at pin III/3
and EVAP canister purge valve
connector, pin 2
4 Check EVAP canister ♦Disconnect hose from EVAP can- The vacuum must
purge valve ister purge valve to intake sys- not fall below 0.5
tem at EVAP canister purge bar after 10 minutes
valve
♦Remove connector of EVAP can-
ister purge valve
♦Connect special tool 9160/1 to
EVAP canister purge valve
♦Generate vacuum of approx. 0.7
bar
5 Check hose line between ♦Undo hose at intake system The vacuum must
EVAP canister purge valve not fall below 0.5 ♦Remove connector of EVAP can-
and air intake system bar after 10 minutes ister purge valve
♦Connect special tool 9160/1 to
EVAP canister purge valve
♦Generate vacuum of approx. 0.7
bar
0-65 page 2 2023 P0441
p0441 Printed in Germany – 1, 2000
This is a source reference. Confirm exact model applicability in the original material.
