Porsche DME 7.8 — OBD II Diagnosis Manual / PAGE 570
DME 7.8 DME 7.80 · Diagnosis/Troubleshooting
Read extracted page text
OCR can contain errors. Check the original page image for exact wording, warnings and specifications.
DME 7.8 DME 7.80
Diagnosis/Troubleshooting
Note!
♦Fuel tank ventilation diagnosis is initiated with the Porsche System Tester 2 in the "Short test" menu. This
reduces the time elapsed after engine start-up to 30 seconds.
♦The EVAP canister purge valve is very sensitive to contamination. If the lines to the EVAP canister have to be
detached, the outside of the canister must be cleaned beforehand.
Work instruction Display OK If not OK
1 Check shutoff valve for ♦Remove front right-hand wheel Replace shutoff
leaks housing liner valve
♦Detach connector of shutoff
valve
♦Detach ventilation line of shutoff
valve
♦Connect shutoff valve to the bat-
tery or a separate power supply
unit via special tool
V.A.G.1315A/1.
♦Do not actuate the shutoff valve
for more than 5 minutes (over-
load)
♦Connect special tool 9160/1 to
EVAP canister
♦Using special tool 9160/1, gen-
erate a vacuum of 100 mbar
(0.1 bar)
0-75.1 page 2 2023 P0456
p0456 Printed in Germany – 6, 2002
This is a source reference. Confirm exact model applicability in the original material.
