996 Carrera Group 1 – Part 1 Engine / PAGE 43
Installation b. Detachthreadedpart A by pullingit off the · The engine-transmissionunit i
Read extracted page text
OCR can contain errors. Check the original page image for exact wording, warnings and specifications.
Installation b. Detachthreadedpart A by pullingit off the
The engine-transmissionunit is installed in the nipple.
reverse order. The following points must be gi-
ven special attention:
1. Before the engine is installed,prepare plug~n
couplings of the steering lines for plugging to-
gether:
a. Tilt holder C on one side and simultaneously
pull to disengage.
367 -97
c. Close holder C. Screw threaded part A with fit-
ted holder C into plug~ncoupling Band
B tighten. Counter when tightening.
Tighteningtorque of the steering pressure line
(wrench size 15) 30 Nm (22 ftlb.).
Tighteningtorque of the steering return line
(wrench size 19) 40 Nm (30 ftlb.).
366-97
368 -97
10 01 19 Removing and installing engine (vehicle with Tiptronic transmission) 10 -15
Printed in Germany, 1997 996101.
This is a source reference. Confirm exact model applicability in the original material.
