996 Carrera Group 2 Fuel, Exhaust, Engine Electronics / PAGE 66
Starter, power supply, cruise control 911 Carrera (996) · Installation
Read extracted page text
OCR can contain errors. Check the original page image for exact wording, warnings and specifications.
Starter, power supply, cruise control 911 Carrera (996)
Installation
Tightening torques: 4. Engageaccelerator cable and install throttle
body. Fit fastening screw M6 x 20 at the
Terminal30 Nut M8 15 Nm (11 ftlb.) bottom right.
Terminal50 Nut M6 6.5 Nm (5 ftlb.)
Hexagon-headbolt MID 45 Nm (33 ftlb.) 5. Tighten the outer hose clamps of the rubber
sleeve after securing the throttle body on the
hydraulic pump housing. The throttle body
1. The angledcablelug of terminal50 (M6) must not contact the hydraulic pump housing.
faces in drivingdirection(transmission)after
assembly. 6. The intake system must be checked for leaks
after assembly(visual inspection).
2. Carefullycentre the intake distributor. Push
both rubber sleeves onto the intake distributor
up to the marking (line)and secure (2 hose
clamps).
104 -97
Arrow shows marking (line)on the intake
distributor
3. Check bore in the rubber sleeves for check
valve and vacuum to the fuel pressure
regulator for clear passage.
27-2 27 60 19 Removing and installing starter
996271 Printed in Germany, 1997
This is a source reference. Confirm exact model applicability in the original material.
